How To Install Flooring On Concrete
Surface prepartion - Your concrete will be cleaned and possibly ground to get it ready for staining polishing or resurfacing.
How to install flooring on concrete. This is an optional step but can really benefit your tile installation in the long run. 500-750 square feet of coverage. While the newly laid base concrete is still green the topping shall be placed in position as soon as possible but not later than 2 to 3 h of laying base concrete depending upon the temperature and atmospheric conditions.
It will also provide a stronger adhesion between mortar and concrete. Add Padding for Comfort. Remove Anything Standing Between You and the Concrete.
Use a quality cleaner like Zep Professional Concrete and Masonry Floor Cleaner 27 per gallon. Then go along the side of the plank so it snaps into the previous plank. Decorative treatment - The installation process will be different depending on which finish you choose for your floors.
The most asked question is on whether you need underlay for vinyl plank flooring or not. The next step is to apply a concrete sealer on the floor surface. For an easy time measuring the floors imperfections without a big level use a laser level or run a string across the floor.
Before installing any wood floor over concrete youll need a moisture barrier. Using a glue-down floor is an option in above-grade installation only since installation below grade requires a plastic barrier on top of the concrete. Lay 6-mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
You need to connect the end of a plank to the previous one first. Concrete is very hard. The base concrete shall be laid in accordance with the specification.